RampageHopUps
Well-Known Member
- Messages
- 4,865
- Location
- Chandler, AZ
OK folks, we are having meetings with the factory about some of the upgrades we want done for 2010. Here are the list of things they are changing:
1) Heat Treat on the dogbone cup shafts. If you have broken ones, please PM me a picture, so I can show the factory.
2) Changing the square drives from aluminum to steel.
3) Changing the gear shafts to a hardened steel.
4) Securing the dogbone pins with a set screw.
These seem to be the majority of the problems when going to 5+ Horsepower motors. We are hoping to get these done for January shipments.
1) Heat Treat on the dogbone cup shafts. If you have broken ones, please PM me a picture, so I can show the factory.
2) Changing the square drives from aluminum to steel.
3) Changing the gear shafts to a hardened steel.
4) Securing the dogbone pins with a set screw.
These seem to be the majority of the problems when going to 5+ Horsepower motors. We are hoping to get these done for January shipments.